Lots of cutting to do on the back deck for the salon, back deck, fuel tanks and holding tank.
Click on any picture to see a larger image. Then click the back button to return to this page.
|  |
 | This
is the only foam that will have to be removed. There is so much
foam in the boat it could never sink, like the Titanic. |
| So much for such a small compartment, just as much on the other side. |  |
 | About 5 loads of foam and body parts to the dump. |
| Back deck is cut out |  |
 |
 | Deck cut out for where the fuel tanks and holding tank go. |
| Fuel tank, needs the lifiting eye removed. |  |
 | Fuel
tank on each side and the holding tank in the middle with the shaft
running through the middle. The holding tank can be larger if set
forward of the stuffing box. |
Didn't
plan to remove the aft bulkhead on the engine hatch but replacing
it with plywood will make it a cleaner area in the engine room for
mounting equipment.
Next: Fuel tank construction |  |