page_up_date.htmlUpdated
May 26, 2010





The Official Blog of the
  

advertisements


anuncios
Minka
Hot new Musical Group


Book Travel
Taxes and Accounting


The first Waterfall


Treegap
Petersburg,Alaska
Waterfront
Home

FOR SALE







 

footer.html



Email:
email.html info2@waterfall2.com

Back Deck cutouts

navigation_bar.html
Home
Design and Layout
Equipment
Construction
     Phase One - Complete
      Phase Two - Complete-
      Phase Three - Next
Cruising Plans
Naval Plaque
Similar Boats Available
Items for Sale






Lots of cutting to do on the back deck for the salon, back deck, fuel tanks and holding tank.

Click on any picture to see a larger image.  Then click the back button to return to this page.
This is the only foam that will have to be removed.  There is so much foam in the boat it could never sink, like the Titanic.
So much for such a small compartment, just as much on the other side.
About 5 loads of foam and body parts to the dump.
Back deck is cut out
Deck cut out for where the fuel tanks  and holding tank go.
Fuel tank, needs the lifiting eye removed.
Fuel tank on each side and the holding tank in the middle with the shaft running through the middle. The holding tank can be larger if set forward of the stuffing box.
Didn't  plan to remove the aft bulkhead on the engine hatch but replacing it with plywood will make it a cleaner area in the engine room for mounting equipment.  

Next:
Fuel tank construction 
Back to top
footer.html