Ready for bulwarks
Click on an image to see a larger image. Click on the back button to return to this page. |
A jig made of 2 x 4's was set up to bend the 1/2 plywood to.
|

|

|
The
plywood was fiberglassed on one side before installing it on the jug. Two pcs
of 3/4 inch plywood 4 inches wide are at each joint of plywood.
There are two layers of plywood with the joints staggered a four feet
apart. |
First layer up and looks good enough to continue.
|

|

|
Both layers up and the aft end is trimmed to shape.
|
First, fiberglassed between the jig components
|

|
 |
and screwed to the deck with 1/4 x 2" stainless steel screws three inched apart.
|
After the jig components were removed the fiberglassing was completed and the remaining screws put in.
|
 |
 |
Trimmed and the top fiberglassed
|
Both sides completed. The outside joint at the deck was filled with cabosil and radiused.
|
 |