page_up_date.htmlUpdated
May 26, 2010





 

The Official Blog of the
 
 

advertisements


anuncios
Minka
Hot new Musical Group


Book Travel
Taxes and Accounting


The first Waterfall


Treegap
Petersburg,Alaska
Waterfront
Home

FOR SALE







 

footer.html



Email:
email.html info2@waterfall2.com

Main Cabin Sole

navigation_bar.html
Home
Design and Layout
Equipment
Construction
     Phase One - Complete
      Phase Two - Complete-
      Phase Three - Next
Cruising Plans
Naval Plaque
Similar Boats Available
Items for Sale







Engine enclosure to be removed before the main cabin floor can be built.  Most of the hardware has already been stripped.

Click on any picture to see a larger image.  Click the back button to return to this page.
The hatch is not coming out by reversing the installation instructions.






Upper - Existing fuel tanks to be removed.
Lower - Tanks disconnected and moved out.  One tank had about 40 gallons in it and the other about 20 gallons.  To get rid if it I gave the fuel to someone who would pump it out.

All major components have been removed, little grinding to clean up and start on the main cabin  floor.
Floor is framed and ready for plywood.
Main cabin floor is complete.  Why treated plywood, you ask.  Since it will be exposed all summer to the rain and sun I think it will hold up better than plywood that would normally be used.

Next:  
Holding Tank
Return to top
footer.html