 | The
limber hole needs to be extended under the holding tank and the shaft
needs to run through a tube through the holding tank.
Click on an image to see a larger image. Click on the return button to return to this page. | | The
above parts are fiberglassed in and a ledge for the front of the lid to
set on. Any extra resin that was mixed was painted on the walls
to give it extra sealing. |  |  | The
pump out tube is set and fiberglassed to hold it in place. The
ledge on the front for the lid is drilled for the ss screws.
Whenever a ledge is needed like this one extra matt needs to be
used to ensure a seal on the corner of the angle. | Tank
is complete. Calculates out at about 116 gallons. Good
capacity if have to dump gray water into it. Five layers of
one ounce matt were wetted out on
the underside of the lid across the front then the screws
compressed it to make the seal.
The discharge line will have a "T" connected and a
valve for hookup of a mascerator pump. There will be a sightglass
to see in the top 1/3 of the tank. When it gets too dirty to see
it is easy to change the clear plastic tube. |  | Back to the Top
|