page_up_date.htmlUpdated
May 26, 2010





 

The Official Blog of the
 
 

advertisements


anuncios
Minka
Hot new Musical Group


Book Travel
Taxes and Accounting


The first Waterfall


Treegap
Petersburg,Alaska
Waterfront
Home

FOR SALE







     

footer.html



Email:
email.html info2@waterfall2.com

Holding Tank

navigation_bar.html
Home
Design and Layout
Equipment
Construction
     Phase One - Complete
      Phase Two - Complete-
      Phase Three - Next
Cruising Plans
Naval Plaque
Similar Boats Available
Items for Sale






The limber hole needs to be extended under the holding tank and the shaft needs to run through a tube through the holding tank.  



Click on an image to see a larger image.  Click on the return button to return to this page.
The above parts are fiberglassed in and a ledge for the front of the lid to set on.  Any extra resin that was mixed was painted on the walls to give it extra sealing.
The pump out tube is set and fiberglassed to hold it in place.  The ledge on the front for the lid is drilled for the ss screws.  Whenever a ledge is needed like this one extra matt needs to be used to ensure a seal on the corner of the angle.
Tank is complete.   Calculates out at about 116 gallons.  Good capacity  if have to dump gray water into it.  Five layers of one ounce matt were wetted out on the underside of the lid across the front  then the screws compressed it to make the seal.

The discharge line will have a "T" connected and a valve for hookup of a mascerator pump.  There will be a sightglass to see in the top 1/3 of the tank.  When it gets too dirty to see it is easy to change the clear plastic tube.
Back to the Top
footer.html