February 07, 2010 |
The
Official Blog of the
|
|
|||||||||
![]() |
|||||||||||
|
Email: |
Phase Two (Active) |
||||||||||
|
Phase Two will be to build the cabin, install the windows, build the foward bulwarks and build and install the swim step. Started late October, 2009. Main Cabin Shell Some details are not shown here if they were the same as was done on the trunk cabin. |
||||||||||
|
|
|||||||||||