page_up_date.htmlUpdated
May 26, 2010





 

The Official Blog of the
 
 

advertisements


anuncios
Minka
Hot new Musical Group


Book Travel
Taxes and Accounting


The first Waterfall


Treegap
Petersburg,Alaska
Waterfront
Home

FOR SALE







 

footer.html



Email:
email.html info2@waterfall2.com

Salon Sole and Aft Deck

navigation_bar.html
Home
Design and Layout
Equipment
Construction
     Phase One - Complete
      Phase Two - Complete-
      Phase Three - Next
Cruising Plans
Naval Plaque
Similar Boats Available
Items for Sale







Pony walls for the deck.  Used treated wood and stainless steel ringshank nails with a power nailer.  

Click on an image to see a larger image.
Click on the return button to return to this page.
Deck joists, also nailed in place with the stainless steel ringshank nails.  Part of the fun of working outside is all of the water that has to be dealt with.  Would be much better to do the work in a shop.

Blocking on the outside edges of the deck.
Holes in deck for access to bolting on the swim step. Port side.





Holes in deck for access to bolting on the swim step.  Stbd side.







Air intake for the engine.
Access in the deck for an exhaust pipe fitting.

Deck access for muffler.
Blocks along the edges of plywood to give it more strength.

And Walla !!  Decks complete and ready to start on the cabin.
Back to the Top
footer.html